By building code, we have to drywall the basement exterior walls, so we have contracted for Bruce's guys to do this nasty job as well. Next year, after we've framed in some bulkheads downstairs, we'll have to board up the ceilings and the mechanical room walls, but that job will have to wait for now.We have arranged for emergency lodging with some friends if the dust and mess drive us from the house completely, but we're hoping that it doesn't come to that.
We've included a few photos of all the board on the walls to give you an idea what it's like here now. Note, the pink insulated ceilings are not being drywalled. They will be covered with tongue-and-groove pine boards at a later date. Next week, we're on to painting the walls; and then laying down the flooring; oh, and getting some loads of gravel on the driveway, and....the list goes on and on.

No comments:
Post a Comment