Monday, October 29, 2012

Fencing

We've been working our a##es off lately and this last weekend was no different. After getting our fence posts in last week, we needed to get on to installing the electric wire, gates, solar engergizer, and ground rods. If you are not aware, our weather has not been great, with several inches of snow having fallen, most of it still on the ground. This has made working outdoors difficult & messy. It's not quite cold enough to be frozen solid, but it's not quite warm enough to melt everything either. It's just ugly.
All the "stuff" for our fences arrived safely last week, thanks to John and Lesley at Ferris Fencing in Courtenay, BC.


The heavy coils of HotCote wire and the solar energizer arrived directly from the manufacturer in the USA with the remainder coming from Ferris on the Island.
We quickly realized that we needed some way to unwind the wire in a way that enabled us to feed it through all the insulators (900+) that Carol had installed on the posts, without binding up or kinking. After some Googling we discovered the device we needed was a "spinning jenny".

Of course nobody in town had one in stock but Tom at The Horse Barn ordered one up and promised it would be here late on Saturday. We spent Saturday putting in some of the many gates we would need and installing a few of the ratcheting tensioners that mount on the terminal posts. I went into town, picked up the spinning jenny, brought it home and assembled it ready for use on Sunday morning. Sunday was foggy and snowing when we first went out but it didn't take long for the fog to burn off revealing beautiful skies and even a little sunshine.

 The spinning jenny worked great and we quickly became electric fence wire stringing experts. Good thing, as we have 2 miles of the stuff to install! By the end of the day (and the end of the light) we had one of the paddocks almost completely fenced in with only a couple of short sections still needing wire. We have yet to brace the terminal and corner posts so could only apply very light tension to hold everything together. The bracing rails will be here on Wednesday so that job can be completed and the fence brought up to full tension. And so it goes...
I've included a couple of other shots to show off our "Muskoka" wood rack that we keep in the house. As you can see, Ben loves laying in front of the fire!
The other image shows Carol preparing a meal on our wood stove. She's become very good at this great energy conserving method of cooking. We have the stove going anyway to heat the house so this was just a no-brainer. BTW, it was a very tasty beef stew! Mmmmmmmm

Sunday, October 21, 2012

Snow!? No wait, we're not ready for winter yet!!

It's hard to believe, but we woke up to 2" of snow yesterday (Saturday). Wasn't it just a few weeks ago that we were in the middle of some beautiful summer weather? I guess that's life up here in the high country.
On the way back from Lea's last night, there was a big fir tree blown down across Campbell Range Road, about 1/2 km from our driveway. We decided that we would get up early the next morning and go buck it up with the chainsaw and bring it back home to split for firewood. After getting over the shock of the ground being covered with the white stuff, we headed out at 8:30am to do just that. Of course, by that time some good samaritan had already chopped up the top of the tree that was laying across the road leaving most of it for us. We took both the truck and the Bobcat ATV as we expected to get quite a haul of firewood. We were right. We left the site with the pickup almost filled level in the back. We thought that rather than waste the empty ATV, we would stop on the way through the crown land on our driveway and find another downed tree to cut up. We didn't have to look for long so only 40 minutes later, we had both the truck and the Bobcat full to the max.
Last year we used the deck to mount the splitter on when doing the firewood. Seeing as the deck is now finished with railings and a vinyl covering, we have built a small splitting station next to our wood shed. It is very convenient in that location and Carol has been keeping busy splitting all the logs that I bring back with the ATV. We have the woodshed full and then some, because we know from last year that we will need to have the equivalent of 3 to 4 "wood sheds" of firewood to get us through the cold winter months. That work is still ongoing.
One job that is complete is the fence posts. John, from Frolek Fencing brought his amazing skidsteer vibratory post pounder up to our place on Wednesday evening and by noon on Friday, he was done! Over 300 fence posts were installed, giving us 4 large paddocks, a round pen, and a smaller "diet" pen. This would enable us to have cattle on our property as we have the last couple of summers, and keep the house safe and give us lots of room for the two horses.
Some of our 300 fence posts!
We will be using a solar powered energizer to power the 3 strands of HotCote wire that will be installed on those posts. Each post will receive 3 plastic insulators to keep the wire from shorting to ground once energized. It will give any animal that touches it, a healthy jolt (like a static shock you get when running around on the carpet with your nylon socks on!). They quickly learn to give the fences some respect which results in less wear and tear on both the fences and the horses!
We should have all the wire and hardware tomorrow. It is being shipped to us directly from the States by our supplier. We've already managed to install some of the insulators but with more than 900 required, we still have many left to go.

Speaking of horses, Carol and Whisky are still getting together with Ray at Dreamscape Ranch every Wednesday afternoon. He is doing great! Apparently, he is a quick learner as Carol is now able to steer him around and back him up with the reins. For now, of course, Ray is still there with a lead rope on him in case Whisky gets annoyed with Carol on his back, but so far, all is going well.

Thursday, October 11, 2012

Whisky changes everything!

In my last post I mentioned that we were getting a new addition to our family, Whisky, the little rescue horse. He is doing very well at Dreamscape Ranch, loving all the attention that Lea, Sara and the girls are giving him - along with all that good food! Lea estimates that he has gained 50 lbs since his arrival just a few weeks ago! He is looking much healthier and happier. The farrier (Shelley) has trimmed his feet, the vet (Jennifer) came up and gelded him (I'll leave it up to you to Google "gelded" if you're not sure what that means!) and removed a small growth from his thigh, Lea gave him his de-worming medicine, and Carol has been up working him in the round pen a few times. He is much improved and has bonded nicely with Mystery, his corral mate who will be accompanying him up to Gull Lake Ranch.

He seems very smart and learns quickly. So much so, that Lea and Carol decided to bring their favourite horse trainer, Ray Scott, up for some lessons with the little guy. Ray put him in the round pen and after a brief episode running, bucking and generally being a baby horse, Whisky settled down and went to work. He did well and even allowed Carol to mount and sit in the saddle while Ray walked him around the pen. It was all very exciting. Carol was a little nervous at first, but trusted that Ray would know if Whisky was ready for that big step. Apparently, Ray was right (as usual!) and rider and horse had an uneventful first ride together.


We had planned on owning horses "one day", but with the arrival of Whisky, that day is today. That means that all those jobs that needed doing next year to prepare our place for keeping horses, have to be done right now. We need fencing, corrals, gates, hay, feed, water, and shelter for Mystery and Whisky to be able to winter up at Gull Lake Ranch. We have decided on electric fencing as this will be much less expensive than traditional post and rail fencing. Arguably, it's also better for the horses as they tend to get tangled up in just about anything. The shock from the electric fencing keeps the horses safe as they tend to avoid getting too close to the fence itself. After asking around and shopping for fence vendors we have chosen Ferris Fencing on Vancouver Island to supply the fence hardware. We are already in the process of having all the fence posts installed by John Frolek of Frolek Fencing. Jim and Val Kershaw were kind enough to deliver 150 hay bales up to our place last weekend. We found some plans online for horse shelters, or loafing sheds as they are known. We will be building one using left over material from our house build. Eventually, we will dig a trench for a water line to service the paddocks, but for this winter it will be a "bucket brigade" job hopefully using the ATV to haul water in containers to the horses. Grain and supplements will be prepared in the basement/barn as we have come to refer to it lately. This gives us a warm place (thanks to the new heaters!) to perform this chore, but is 100 yards from where the horses will be so time will tell if this works out. Some friends have donated or lent us enough blankets, halters, and lead ropes to get us started. Lea has volunteered to bring the two horses up in her trailer once we have the fences in place. Lesley at Ferris Fencing thinks we should have everything we need by the end of next week so as long as John manages to get all the posts in by then, we should be good to go by the end of October. That should be just in time for the snow to arrive! I guess that finishing the siding will have to wait for now.
Hmmmm, better get cracking on the firewood supply, too. Where did the summer go?!

Wednesday, September 26, 2012

It's fall already!

The fall weather means that we're going to need to stock up the wood pile again. We had planned to install direct vent space heaters in our home so we could leave the house for more than a few hours without having to worry about everything freezing up. After much online research, we settled on Cal-Gas here in Kamloops to supply the units we needed. Fred uses the Empire brand heaters in his own home and highly recommended them for our situation. Being "off grid" we must satisfy all of our electrical power needs with our solar panels and diesel generator. There are no hydro lines running to our house. The Empire heaters we chose use no electricity at all, burning propane and using convection to heat the cooler air at floor level, allowing it to rise naturally. That's where our ceiling fans come into play. They will push the warm air down from the roof to the rest of the room. Granted, the fans do use some power but it is a very small amount when running at the lowest speed and they wouldn't have to operate continuously.
We chose 2 different models for our home - the DV-35 (35,000 BTU) and the DV-210 (10,000 BTU). We put one DV-35 in the basement, one DV-35 in the dining room part of the great room, and one DV-210 in the spare bedroom on the main floor. This bedroom receives the least benefit from the heat of the wood stove and will not be used most of the time so we can keep it cooler until occupied by guests, at which time they can simply turn up the thermostat to a level that keeps them comfortable. We haven't had to use these guys yet (thankfully!) but are confident that they will allow us to keep the house warm at all times, even if we're not home to fill the wood stove every 8 hours or so. The basement heater will keep our water lines safe from freezing and make the area usable for whatever we want.
Direct vent technology means that the heaters get all their combustion air and vent their exhaust gasses through a double-walled pipe going through an exterior wall. Outside, all you see is a small vent cap mounted on the siding. In testing, the units are very quiet - another benefit! - and seem easy to use. There is a pilot that needs to be lit at the beginning of the season but it has a BBQ-style sparker to ignite it and a thermopile that shuts off the gas if the pilot light goes out. They come with everything you need to install them except for the short flexible gas line that must be installed by a certified gas fitter. We hired Brock from Rivercity Air to come up and install the units and he made quick work of it installing all 3 in less than 8 hours. He's a very nice guy and does great work so if you need someone to help with heating and cooling your home, look him up and give him a call.

Work goes on again this weekend with the siding. We've got to get all the remaining stuff on the front of the house. Then we will need to rent some scaffolding to finish up the siding on 2nd floor. Hopefully, the weather will continue to be dry - at least for a couple more weeks. I missed last weekend working on the house as I took a motorcycle trip to Edmonton, Alberta to visit my family. My mum lives just north of the city in St. Albert and my son and his family live in Sherwood Park, on the east edge of the city. It was great to see my granddaughter, Harlee, again. It has been almost 2 years since I was last there. She was only days old then and the change in her is amazing! She's walking, talking and generally being super cute. It was worth missing some "house" time to spend some time with her!

Oh, and it looks like we have a new addition to our Gull Lake Ranch family - a young colt we rescued from a future at the meat plant. "Whiskey" is a little over 2 years old and is a quarter house/paint horse cross who (we think) will mature to be a little over 14 hands high - perfect for Carol. He was gelded yesterday and had his feet trimmed so will not be in the best of spirits for a day or two. We owe Lea and Sara and the girls at Dreamscape Ranch a big "thank you" for finding him and looking after him until we have our place set up to look after him. He is super cute and seems very calm and friendly. We hope he likes his new home. One of Dreamscape's "retirees", Mystery, will be keeping him company at our place.



















Wednesday, September 5, 2012

September...yikes!


Looking at the calendar, I notice that it reads, "September 5, 2012". We've been living in the house now for just over a year. It's hard to believe that a whole year has passed since Carol's parents visited late last summer. Inside the house is dramatically different with insulation, walls, flooring, a kitchen and two bathrooms all looking much like the finished versions we had in our minds' eye. Our electrical and water systems are pretty much finalized with just the basement and exterior lighting left finish. The mechanical room is looking pretty good with everything organized per the inspector's report.




We are slowly reducing the piles of "stuff to be installed" and getting some of the boxes of personal items put away in their new homes.
Outside, it's still a different story. The siding we were hoping to finish by the end of August is, of course, taking much longer than I first anticipated. Don't get me wrong, it's coming along nicely now, but it will be another month before we have it all done.




Where the siding is up the house is looking really nice. Finally, we are managing to hide the Tyvek house wrap under our Autumn Red fibre cement Certainteed siding. It goes up quite quickly but slows down around all the items that interrupt the clean expanse of the walls - stuff like windows, doors, vents, faucets, and outlet boxes. Since we have 19 windows, 3 doors, 5 vents, 4 outlets, 2 taps and a couple of conduit entrances, the installation goes "slowly," if I have to choose a word. Before they are nailed to the wall, the siding boards are easily broken if not handled properly. 



Compounding that concern is all the cutting and manipulating that has to happen to go around all the aforementioned obstructions. Tedious and fiddly work, this satisfying the Building Code! As I said earlier though, the place is starting to look good!
I have to get my butt in gear. We're running out of warm weather (not this week though, with highs forecast to hover just below 30*C) and I will soon have to focus on our firewood supply. Some good news on that front is that we should have our direct vent propane space heaters installed by the end of next week, courtesy of Fred and his team at CalGas.

That will take some of the pressure off our wood stove this winter and allow us to leave the place for more than a few hours without fear of freezing up all the pipes. We will use more propane with these in place but if you consider that we have only used about a third of our tank over the last 11 months, that should not be a big problem.

Monday, August 20, 2012

Busy Weekend

Carol's birthday falls on a Monday this year, so we decided to celebrate it on the weekend just before. I had invited our friends Roy and Patou to join us for dinner and drinks on Saturday evening. Within a few minutes of that invite going out, Paul, Tamara and Paris emailed to ask if they could come to visit over the weekend. I figured the more the merrier, so we set it up. If you remember, we haven't done the floor in the guest room yet so we decided to take the day off from the office and get it done. It would also give us some time to vacuum up the dog hair before the Paul's bunch arrived later in the day.

We were up and at it early and had the floor finished by 3pm. It looks great, and it's nice to have the last of the flooring on the main and upper floor finally done. I went down to meet them at the highway so they could follow me up to the house. Right on time, they pulled up at 5pm and we wound our way up the tight switchbacks on the east end of Robbins Range Road. Carol and the dogs were standing on the deck as we pulled into the drive beside the house. Much barking and carrying on later, we were finally able to make our way inside.
The weather was predicted to be hot, in the mid to high 30's all weekend and it didn't disappoint. It was smokin' all weekend! We BBQ'd some steaks, had some wine, and settled in to enjoy the evening. Now THIS is why we put this big deck out here!
The next morning I took Paul for a tour in the Bobcat ATV showing him how it worked and where a few of the local roads/goat trails went. The plan was for him to take Tamara and Paris exploring. It was a good plan and the girls really took to it. I think the 3 of them spent about 5 hours over the weekend travelling many of the back roads and trails in the area. My take on it was they had a blast!
Saturday evening, as I said before, our friends were coming over for dinner. It turns out that they have two students from Germany staying with them, Maria and Peter. Of course they were welcome to join us, and as it turns out, it was Maria's 21st birthday on Saturday! Carol had made some of her famous BBQ spare ribs and potatoes, and with Patou's salad, Tamara and Paris' awesome cake decorating and the cake that I baked (yes, it was from a box!), we had an awesome meal! Carol and Maria took turns blowing out the candles. It was quite late by the time we got cleaned up, said goodbye to our dinner guests and fell into bed.





Another beautiful morning on Sunday meant we spent the entire day on the deck with most of us getting some good sun. Paris' paddling pool was a big hit as a place to cool one's feet after walking around on the hot deck. Another ATV ride and then Paul and family set out for the coast around 4 pm. It was left over ribs and steak sandwiches for dinner for us and another excellent episode of "The Newsroom" before bed for we Gull Lake Ranch residents. A really awesome weekend. Thanks, everyone!

Tuesday, August 7, 2012

Siding Progress



After a week of hard work, this is the result.
The siding on the basement level is finished.
Siding on the back half of the house is well under way. This (the back half of the house) represents the bulk of the actual siding as there is very little of the stuff installed on the front walls, and although there is more on the front sides, it is easily accessed from the deck.
Access has proven to be a big time consumer. In order to work from ladders and/or scaffolding, the ground must be relatively flat and stable.
 Our driveway and the dirt around the back of the house is not yet  "to grade" and was quite rough in spots. I spent quite a number of hours on the tractor smoothing it out, filling in the low spots and topping it all off with gravel from one of the handy piles left over from early in the construction. It is paying off, and things are progressing much better now.






The first job is to install the pressure treated 1x3's around all the doors,windows and obstructions (vents, taps, outlets, lights, etc.) then the siding itself, and finally the white trim boards. The result is very nice as you can see from the finished product on the basement level. We are targeting to finish this job by the end of the month (August) but that will depend on the amount of time we can take off from our real jobs at the office. This is just another challenge we must face as we move toward successful completion of our home.